Traffic Update- Bancroft Drive and The Kingsway

Jan 17, 2018

Bancroft Drive, Sudbury- A private company will close a section of the eastbound curb lane on Bancroft at Second Avenue on Thursday, January 18 for repairs to a manhole. Work will take place from 8 a.m. to 8 p.m.

Kingsway, Sudbury- Excavation of an existing water main break patch will result in two westbound lane closures on the Kingsway between Bancroft Drive and the McDonalds on Thursday, January 18. Two lanes of traffic in each direction will be maintained during the repairs. Work will be done between 7 a.m. and 7 p.m. and traffic control will be in place.