Reduced Load Restrictions Begin March 16, 2025
The reduced load period begins March 16, 2026 at 12:01 a.m. The end date will be determined based on road conditions. All roads covered by half loading are posted with regulatory signs.
The reduced load period begins March 16, 2026 at 12:01 a.m. The end date will be determined based on road conditions. All roads covered by half loading are posted with regulatory signs.
The City of Greater Sudbury is located on the Traditional Territory of Atikameksheng Anishnawbek and Wahnapitae First Nation who are signatories to the Robinson Huron Treaty of 1850.