Traffic Update - September 29, 2017

Sep 29, 2017

Lasalle Blvd: The Eastbound curb lane in front of 1021 Lasalle will be closed Oct 2, 2017 from 9 a.m. to 3 p.m. to allow a private contractor to unload and load paving equipment. 

Big Nickel Mine Road: Intermittent lane closures on Big Nickel Mine Rd will take place October 3 and 4, 2017 between 9 a.m. and 3 p.m. to allow maintenance by a private contractor.  Signs will direct traffic.

Tilton Lake Road: Traffic will be down to one lane on Tilton Lake Rd., west of Wolf Lake Rd., Tuesday, October 3 to Friday, October 20, 2017 due to culvert replacement by a private contractor..  Access to any driveways within the work zone will be maintained or alternate parking will be provided. Pedestrians will have access around the construction site at all times.

M.R. 35: Installation of concrete traffic islands on M.R. 35 at the Day/Milman entrance for is scheduled to begin  Monday, October 2, 2017. Both the centre eastbound and westbound lanes will be closed starting at 9 a.m. for the week of October 2 to October 6. One lane in each direction will be provided in the outside lanes. Lane closure and advance warning signs will be posted. Motorists are urged to slow down through the construction zone.