Falconbridge Road, Sudbury: A contractor will close the north bound curb lane, on Falconbridge Road near Barrington Street, to install an entrance to a private property from May 20 to June 28. Work will be done between 9 a.m. and 3 p.m.
 
Culver Crescent and Access Road, Sudbury: Belanger Construction will begin work on Culver Crescent and Access Road on Tuesday, May 24 between 7 a.m. and 6 p.m. A minimum of one lane of traffic will be maintained while work is being done. Detours will be posted. Pedestrian access will be maintained. 
 
Moonlight Avenue, Sudbury: Ongoing capital construction will close Moonlight Avenue from north of Hines Street to south of the Kingsway starting on May 24. Local traffic will be permitted. The intersection of Moonlight Avenue and Hines Street will be open to traffic. The intersection of Moonlight Avenue and Claude Street will be closed for approximately 3 weeks. Detours will be posted. Work will be done between 7 a.m. and 7 p.m.
 
Kingsway, Sudbury: A contractor will close the westbound curb lane to allow for curb work for a private developer at 1024 Kingsway from May 24 to June 3. Work will be done between 9 a.m. and 3 p.m.
 
Kingsway: Sudbury: A contractor will close the westbound curb lane on the Kingsway, at Silver Hills Drive, to install a sidewalk for a private developer from May 24 to June 10. Work will be done between 9 a.m. and 3 p.m.

Kelly Lake Road, Sudbury:  A contractor will be conducting ditching at 1340 Kelly Lake Road on May 24 and 25 from 9 a.m. and 3 p.m. Traffic in the westbound lane may need to yield to oncoming traffic.