Traffic Update - July 3, 2015

Jul 3, 2015

MR 80: Crack sealing on MR 80 between Hubert Street and Valleyview Road in Val Caron will begin at 12 p.m. on Monday, July 6 to Saturday, July 11. Work will close one lane of traffic at a time and will take place from 7 a.m. to 7 p.m.

Mont Adam at Mountain Street: Water main valve chamber repair work in the intersection of Mont Adam at Mountain Street will close Mont Adam from Mountain to 190 Mont Adam, Regimbal Place apartments. Emergency vehicles only will be allowed through. Work takes place Monday, July 6, from 3 a.m. to 4 p.m.

Falconbridge Road: Catch basin repair work will close the north bound curb lane near 3214 Falconbridge Road from midnight, July 7 to midnight, July 9.

Kingsway: Structure adjustments, boulevard work, curb and sidewalk work, paving operations and milling on both sides of the Kingsway will cause lane closures from 7 a.m. to 7 p.m. from Bancroft Drive to the Nissan dealership Monday, July 6, until Sunday, June 12.

Curb, sidewalk, and milling operations work will also take place from Brady Street and Paris Street extending to Silver Hills.