Traffic Update- Paris Street, Allan Street, MR 55, Second Avenue (Minnow Lake)

Oct 19, 2017

Paris Street, Sudbury- Asphalt milling will reduce traffic to one lane on Paris Street at the Ramsey intersection and on Paris Street at the Centennial Drive intersection beginning at 7 p.m. on Thursday, October 19 until 4 p.m. Friday, October 20. A paid duty officer will be on site directing traffic.

Paris Street, Sudbury- Roof work at TDS will close two south bound lanes and the sidewalk in front of Tom Davies Square on Paris Street. Lane closures will be between the entrance and exits to the Paris Street parking garage on Saturday, October 21. Work will be between 9 a.m. and 3 p.m and both the entrance and exits to the parking garage will remain open during the work and traffic control will be in place.
 
Allan Street, Coniston- Water main installation will close the intersection of Allan Street at Edward Avenue on Thursday, October 19 to Friday, October 20. Motorists are asked to use Edward Avenue, Caruso Street, and Wilfred Avenue to access Allan Street. Local traffic and emergency vehicles will have access at all times. Detour signs will be posted.
 
MR 55, Copper Cliff- Bridge rehabilitation work will result in 2 to 15 minute road closures on MR 55, 500 metres west of Power Street on Friday October 20 beginning at 5:30 a.m. Work will be complete by 6 a.m. and traffic control will be in place.

Second Avenue, Sudbury- Asphalt work will reduce traffic to one lane on Second Avenue between Hebert Street and Camelot Drive on Saturday, October 21. Work will be done between 7 a.m. and 7 p.m. and traffic control will be in place.