Class 1-3 Roads:
Main arterial road or secondary collector road
|
Bare or near bare pavement |
- Salting/sanding when storm begins (generally 2-4 hours to complete routes in ideal conditions)
- Snow plows are deployed when there is 5 cm of accumulation
- We work to get class 1-3 roads to the desired condition within 3 to 8 hours after the end of a snow storm, depending on conditions.
|
Class 4-6 Roads
Residential or rural roads
|
Snow-packed and sanded surface |
- Snow plows are deployed when there is 8 cm of accumulation. Sand is applied whenever there is a need to control ice.
- We work to get class 4-6 roads to the desired condition within 8 to 24 hours after a snow storm, depending on conditions.
|
Sidewalks
|
Snow-packed and sanded surface |
- Plow/sand resources are deployed when there is 8 cm of accumulation.
- We work to get sidewalks to the desired condition 24 hours after the end of a storm.
|
Bus Stops
|
Snow-packed and sanded surface |
- Plow/sand resources are deployed when there is 8 cm of accumulation.
- We work to get bus stops to the desired condition 24 hours after the end of a storm.
|