The City of Greater Sudbury (the City), is filing an Addendum to the 1995 Environmental Study Report (ESR) for the Maley Drive Extension. The ESR was approved in 1995 in accordance with the Municipal Roads Class Environmental Assessment (1993), but was never constructed.
The 1995 ESR described the project as having two components: (1) the reconstruction of the existing Maley Drive from Falconbridge Highway to Barrydowne Road; and (2) the extension of Maley Drive westerly from Barrydowne Road to the Lasalle Boulevard Extension.
Maley Drive / Lasalle Boulevard Widening Municipal Class EA Addendum
(PDF 6.4 MB)



